RENOVATION COSTS
Bath Renovation costs
3 BATH FIXTURES
Shower, tile, vanity, fixtures, and glass
$24,000 to $38,000
Shower Enclosure
Tub
Enameled Steel
Wall Tile
Floor Tile
Merola Tile( Metro 2” Hex Matte )
Cabinets
Custom site built to specifications
Counter Tops
Plumbing
Accessories
We are here to create your new bathroom!
*Due to the number of variables involved, you can receive a preliminary cost estimate by scheduling a free consultation.
KITCHEN Renovation costs
There are many factors that come into play when determining the cost of a kitchen renovation. Kitchen renovation prices depend on the complexity of the project. Many costs depend on your personal selections (tile, countertops, fixtures, etc…). Is your project a total renovation including new cabinets and appliances? Or will we save the existing cabinets and reface them? Either way, we have you covered!
Kitchen
Cabinets, appliances, countertops
$38,000 to $87,000
Cabinets
Custom site built to specifications
Door & Style
Enameled Steel
Countertops
Tile Backsplash
Quartz or Granite (Level 4) or 3” x 12” Tile
Plumbing
Hardware
Flooring
Delta Portwood
*Due to the number of variables involved, you can receive a preliminary cost estimate by scheduling a free consultation.
ANSWERS TO QUESTIONS ABOUT BATHS AND KITCHENS
Time frames vary from project to project depending on the final scope of work. Most projects will consist of a 60-90 day timeframe. However, small projects can take as little as 30 days to complete. Your contract will include a start and finish date that is specific to your project.
We do not have a minimum size or cost for a project; however, we are a design/build firm and handle complete jobs. We don’t sell and install single products like plumbing fixtures, flooring, and countertops.
While kitchens are typically more expensive in total costs, bathrooms tend to cost more per square foot to renovate.
We bid our jobs so the client knows the exact cost of the renovation. The only way you will incur extra costs after signing the contract is if you change your mind or something unforeseen is discovered during the course of construction. We also offer a contract plus option for some projects as well.
We bid our jobs so the client knows the exact cost of the renovation. The only way you will incur extra costs after signing the contract is if you change your mind or something unforeseen is discovered during the course of construction. We also offer a contract plus option for some projects as well.